Renovation]PMY_Condo_Rayong_2020 Final R1 3d model
3dmdb logo
3DWarehouse
Renovation]PMY_Condo_Rayong_2020 Final R1

Renovation]PMY_Condo_Rayong_2020 Final R1

by 3DWarehouse
Last crawled date: 10 months, 4 weeks ago
// Assumptions // Age range 20+years old // 2 rooms will be combined to 1 large room, restroom will be combined and will be separated to dry/ wet zone // Concept are cleanliness and minimalist // Disable people will be use this room ~ Requirements ~ Combined 2 rooms by demolish small wall ~ replace with double swing door ~ Terrace will be demolished an existing separated wall ~ Restroom will be combined and handrail for disability person is mandatory Rev.1 ~ Remove Bathtub ~ Bed room relocate Bed position / LED TV position ~ Added Dining Table ~ Change separated door between room wider ~ Change rest room door from swing door to sliding door

Tags