Mellieri NWCL 3d model
3dmdb logo
GrabCAD
Mellieri NWCL

Mellieri NWCL

by GrabCAD
Last crawled date: 1 year, 10 months ago
Mellieri Energia: Integrated Power Plant NWCL

No water
No carbon
No losses

Rating: Data Center TIER X


Oi Simões,
Boa noite. Seja bem vindo!
Entremeio as respostas

Oi, Sobrinho,
Boa tarde. Passe-me mais detalhes. Vocês terão apoio da COMGAS? Há recursos para pagamento de consultoria/bolsas?
https://www.plugue.network/regulamento
Os investimentos COMGAS caso nosso projeto tenha aderência.
Outras fontes de mercado padrão. Insuficientes?
Depois de assistir o 1º Encontro de Extensão na Poli
https://youtu.be/sKpKqisT2mo
Emitimos 17 trilhões de ncwl´s (tokens) para financiamento complementar aos projetos de trigeração. Atrelamos/validamos os totens aos ganhos de eficiência energética (pue) + valorização atrelado à taxas de inflação das principais economias.
Ponderações de Jeff Prestes e especialistas USP
Eu sou de uma geração onde gamer 'era vagabundo' até o surgimento do PC.
Comecei levar o mercado de gamer a sério depois ver um pod cast sobre meninas gamers e o comportamento dos principais Tokens Gaming por Capitalização de Mercado

https://coinmarketcap.com/pt-br/view/gaming/
https://www.youtube.com/watch?v=o-4QoaM74A0&t=508s


Nossas entregas.
PLUGUE COMGAS
0 - modelo de datacenter autosuficiente em energia (trigeração por gas natural) Tier X (100% redundância - zero minutos fora do ar)
Medelar o maior datacenter do Brasil, referência Ascenty em Vinhedo, SP, by trigeração, hoje Tier III, tolera *26 minutos fora do ar/ano.

https://www.ascenty.com/blog/news-ascenty/ascenty-inaugura-14-data-center-no-brasil-o-maior-da-america-latina/#:~:text=Ascenty%20%2D%20Data%20Centers-,Ascenty%20inaugura%2014%C2%BA%20data%20center%20no%20Brasil%2C%20o%20maior%20da,Vinhedo%2C%20interior%20de%20S%C3%A3o%20Paulo.

*https://www.ascenty.com/blog/artigos/classificacao-tier/

2. Retrofit do CTMM Mogi Mirim, autossuficiente em energia, superar meta Itaú PUE 2021.
https://photos.app.goo.gl/dQivrpXo9wr4kaTz7

De fato, já implantamos um sistema de trigeração a GN com apoio COMGAS.
Pré requisito legal

3 Primeira Usina Nuclear de SP por Tri geração com DC Anexo, demandas de processamento da USP, outras universidades públicas do Estado e Terceiros
4. Primeira Usina Termelétrica Gas natural + Data center por trigeração à Gas Natural do estado
5. server, 100% redundância. Pra testar, desligamos a tomada.
--------------

Eco Amcham 2017 Award: Note 4.18
Eco Amcham 2019 Award: Note (let's search) 8 (MVP)
Energy Efficiency: 80% ->

Premises | Scenario:
1-Power Global Losses: 2730 Mtoe or Global Emissions Energy Sector:
2 - All 451 nuclear power plants on the planet use the unused reactor waste heat equivalent to 8 times all the planet's drinking water.
With each passage of water by the reactors the temperature is raised by 8 oC which means to reach 150 oC, therefore, being 100 oC the evaporation temperature of the water, we have a significant amount of steam being generated by the superficial evaporation of the sea from which the higher volume of water for the cooling of nuclear reactors.

All the main sources of energy that support the modern world based on technology and information -> Heat -> Steam -> Turbine -> and the main one is coal, must use residual heat for new projects with heavy use of energy and cold. Data Center for example.

The standard of development is measured by the UN on the basis of energy consumption while at the same time in 2050 we will need 3 planets in the UN vision or 2 planets in the World Bank's view in terms of natural resources and this includes energy .

Assumptions:

TIER X: Disruptive Innovation
TIER IV current standard
TIER V: in consolidation, incremental innovation

Redundancy and physical scalability by Datacenter;
Backup (SIN Integrated National System): No diesel to supply their backup
The world does not have a SIN but has the IT infrastructure for physical data center backup.
The computer is the network. The network is the Cloud.
Data Center In Memory: Cloud In Memory

1) No Water: Nuclear Power Plants, Data Centers and large water consumers in cooling towers use closed cooling towers. The nuclear thermoelectric cooling tower or chimneys in hydroelectric thermoelectric plants are the physical point of contact between global warming, low carbon economy, decarbonization, kyoto protocol, Paris Agreement and etc.

2) No Carbon: No Less: Utilization of TFC utilizes residual heat for cold conversion by non-electric equipment driven by heat: chillers to absorption: or when electric, using magnetic bearings which increases the energy efficiency in thermal plants with nuclear inputs , biomass, hydrocarbons.

3) No Losses: Yes Profits: Minimizing losses minimizes input costs, minimizes thermal and gaseous emissions and maximizes profits.

Use case:
Angra 3 wastewater treatment plant replicable at 451 global sites simultaneously to provide redundancy and scalability for .gov & .com applications.

Author: Zé Sobrinho
Company: Mellieri Energia
100 Open Startup: Score 3

Next step: Mellieri Consortium structuring

Portuguese:

Mellieri Energia: Planta Energética Integrada NWCL

No Water
No Carbon
No Losses

Rating: Data Center TIER X
Premio Eco Amcham 2017: Nota 4.18
Premio Eco Amcham 2019: Nota (vamos buscar) 8 (MVP)
Eficiência Energética: 80% -->

Premissas | Cenário:
1 -Power Losses Global : 2730 Mtoe ou Emissões Globais Setor de Energia:
2 - Todas as 451 usinas nucleares do planeta utilizam para resfriamento do calor residual não aproveitado dos reatores o equivalente a 8 vezes toda água potável do planeta.
A cada passagem da água pelos reatores a temperatura é elevada em 8 oC o que significa atingir 150 oC, portanto, sendo 100 oC a temperatura de evaporação da água, temos uma quantidade de vapor significativa sendo gerado pela evaporação superficial do mar de onde provém o maior volume de água para o resfriamento de reatores nucleares.

Todas as principais fontes de energia que sustentam o mundo moderno baseado em tecnologia e informação --> Calor --> Vapor --> Turbina --> e a principal delas é o carvão, devem utilizar calor residual para novos projetos com uso intenso de energia e frio. Data Center por exemplo.

O padrão de desenvolvimento é medido pela ONU com base no consumo de energia ao mesmo tempo que em 2050 vamos precisar de 3 planetas, na visão da ONU, ou dois planetas na visão do Banco Mundial, em termos de recursos naturais, e isso inclui energia.

Premissas:

TIER X : Inovação Disruptiva
TIER IV padrão corrente
TIER V: em consolidação, inovação incremental

Redundância e escalabilidade física por Datacenter;
Backup (SIN Sistema Integrado Nacional): No diesel to supply their backup
O mundo não possui um SIN mas possui a infra de TI para backup físico de Data center.
O computador é a rede. A rede é a Nuvem.
Data Center In Memory: Cloud In Memory

1 ) No Water: Usinas Nucleares, Data centers e grandes consumidores de agua em torres de resfriamento passam utilizar Torres de resfriamento em circuito fechado. A torre de resfriamento terméletrica nuclear ou chaminés em termelétricas a hidrocarbonetos são o ponto de contato físico entre aquecimento global, economia de baixo carbono, descarbonização, protocolo de kyoto, Acordo de Paris e etc.

2) No Carbon: No Less : Emprego de Trigeração utiliza calor residual para conversão em frio por equipamentos não elétricos movidos a calor : chillers à absorção : ou quando elétricos, utilizando rolamentos magnéticos o que amplia a eficiência energética seja em plantas térmicas com insumos nucleares, biomassa, hidrocarbonetos.

3) No Losses: Yes Profits: Minimizar perdas minimiza gasto com insumos, minimiza emissões térmicas e gasosas e maximiza lucros.

Caso de uso:
Aproveitamento de calor residual usina Angra 3 replicável em 451 sites globais simultaneamente para prover redundância e escalabilidade para aplicações .gov & .com

Autor: Zé Sobrinho
Empresa: Mellieri Energia
100 Open Startup: Score 3

Próximo passo: Estruturação Consórcio Mellieri

Tags