大唐集团漳州六鳌风电 3d model
3dmdb logo
3DWarehouse
大唐集团漳州六鳌风电

大唐集团漳州六鳌风电

by 3DWarehouse
Last crawled date: 1 year, 7 months ago
Datang wind power 3 period 13 new fan by hunan hunan electric group, is also threw six production datang first used in wind farms project of domestic fan equipment. Six in Columbus, Columbus, east wind farms six peninsula area, general arrangement coastline nearly 2 0 km, by datang zhangzhou wind power generation Co., LTD investment, in December 2004, the construction of six datang wind power projects, Columbus, one, two, and three phase 85 Taiwan wind power equipment has been completed and put into production, is estimated to power 100 million KWH. Among them, the first stage project of the wind made in Spain, 36 sets fan single capacity of 850 kilowatts; The second phase installed capacity, the 36 45 mw Taiwan Indian fans, Three phase in December 2007 was built, planning the installed capacity and megawatts (mw), the total investment 270 million yuan, installation and Taiwan mono-device capacity 2 mw grade, change propeller distance and VSCF wind generator. At present the total installed capacity of wind farms will reach 101.6 megawatts (mw) and for the biggest. In addition, datang wind has set up a file in the six threw up on the sea near peninsula measuring wind towers, 80 meters high, for the whole nation the most. Through a year or so after the wind, if the condition is measured, datang power will be open mature built the first offshore wind farms domestic. #陈艺平的模型大唐集团六鳌风电六鳌风车风电陈艺平刺客的悲哀漳州

Tags