厦门海沧大桥是世界第二、亚洲第一座特大型三跨连续全漂浮钢箱梁悬索桥,也是厦门市历史上投资最大的交通工程项目,工程全长5926.527米,主跨648米,海沧大桥设计通行能力为50000辆/日,行车时速为80公里/时,工程概算总投资28.7亿人民币。海沧大桥工程于1996年12月18日破土动工,主体工程于1997年6月份正式开工建设,全桥于1999年12月30日顺利通车。Xiamen haicang bridge is the world's second, Asia the first a large across all three consecutive floating steel box girder suspension, is also the largest investment in xiamen city history traffic engineering project, engineering measures 5926.527 meters, ZhuKua 648 meters, haicang bridge traffic capacity design of 50000 vehicles per day, driving speed of 80 km /, engineering estimate the total investment of 2.87 billion yuan. Haicang bridge engineering in December 18, 1996, the main body of the project started to build in 1997, formally began in June, the whole bridge construction in December 30, 1999 successfully opened to traffic.